BIM Clash Detection – A long term time-saving process

The construction of a building is incomplete unless it has proper integration of BIM clash detection services in it. The AEC projects are typically long, complicated, and a bit expensive. There are a lot many issues that impact the scalability of the work and thus it has to be worked on regularly on scheduling and budgeting. But, if AEC professionals have access to BIM clash detection tools, things for them become easier, quicker, and faster.

Introduction

The technology of digital BIM planning is taken to a next level now. Companies and AEC industries are using the technology of interactive virtual models. The age-old process of 2D sketches or 3D physical models is now outdated. As a result, this is turning out to be a process that saves time and money in designing the project. Further, it also gives access to the wealth of digital and advanced tools that help redefine and refind their BIM models.

BIM Clash detection is the newest and only such type of digital tool. It has some additional features that analyze the project data and highlight the issues that may arise at a later stage. Thus, to avoid rework or redesign of the BIM model, it is necessary to undertake BIM clash detection services. 

BIM clash detection is incomplete in any BIM project unless the team identifies its types. Based on the project design and work, the team can identify the clashes. This further continues with rectifying the issues and redelivering the same to the clients after resolving them. Having said this, here are the types of BIM clash detection services mentioned below:

  • Hard Clash
    This is the first type of clash detection which is straightforward to check. It occurs when two physical objects run at the same time and in the same place. This issue, therefore, leads to clashes and delays in work. Also, it is known as the most complex and challenging work that needs to be handled within time.
  • Soft Clash
    These are the clashes that are not easily or instantly recognized. But, this at the later stage can be problematic. Here, instances can occur where the objects may not be intersecting with each other, but their buffer zone will. This is the issue that is often seen in HVAC Modeling and Drawings. It further raises conflicts and thus needs space for maintenance and access to the data.
  • Workflow or 4D Clashes
    The third and last type of clash does not arise at the project design level. It is the clash that is viewed at the scheduling and other timeline problems stage. This stage of clash detection is when the material delivery is not in time and the workers are not able to work. This is what comes with 4D clash detection services.

The process that can save time for long term

BIM clash detection service is a must-have service in BIM projects. WIthout integrating BIM clash detection technology the work will not be considered in long run. Today, we are discussing the process that can save time in the long run with this advanced technology.

  • Cost-Effective
    BIM clash detection is a cost-effective and efficient tool for BIM projects. It is the tool that saves a lot of time, energy, and manpower that may occur while fixing issues. Thus, with a proper and accurate process of integrating BIM tools, clash detection can be verified and this will turn out to be a cost-effective approach.
  • Safe-Savings
    The safety of labor and manpower is a priority for any construction industry. Thus, these people seek help from the outsourcing companies that can deliver a BIM model that is error- and clash-free. This is why having proper and 100% accurate clash detection in 3D BIM modeling will save the lives of humans who are the ones who are constructing the design and turning into reality.
  • Bills of Material Cost Savings
    While the construction of the building, a huge amount invested in terms of arranging the building materials and their quantity. This could, therefore, lead to a waste post completion of the project. Thus, with proper detailing of design and its data, the cost of bills of material can be saved to a great extent. So, yes, indeed this process also adds meaning to the work and saves a huge amount in terms of stocking the actual material that is required at the physical construction site.

Recent blog Might You Have Missed:
The Role Of Scan To BIM In Building Maintenance For Smooth Operations

Final Words

BIM outsourcing companies across the globe are now switching their demand to have BIM clash detection services at the initial stage of the project. With proper support and understanding, it will thus turn out to be a long-term beneficial process for long-run building life.